What Happens During an ADU Build in Gilbert?

Building an accessory dwelling unit is easier to understand when the project is divided into clear stages. Every property is different, but a coordinated ADU project generally moves from feasibility and design through permits, construction, finishes, and a final walkthrough.
1. Consultation and Property Review
The first conversation should cover who will use the ADU, which rooms are essential, and how the unit should relate to the main house. A site review then considers available space, access, utilities, and conditions that may affect placement.
2. Concept and Layout Planning
The design team translates priorities into a workable plan. This stage addresses the entrance, windows, storage, kitchen, bathroom, mechanical needs, and exterior appearance. Ideas should be tested against the site rather than treated in isolation.
3. Documentation and Permitting
Detailed plans provide the information needed for review and construction. Local requirements and review times can change, so rely on current, address-specific guidance. Five Star Design Build states that it coordinates permitting as part of its ADU process.
4. Construction
After approvals, work can move through site preparation, foundation, framing, roofing, utility rough-ins, insulation, drywall, and exterior finishes. Required inspections happen at key stages. Weather, lead times, revisions, and site discoveries may affect the sequence.
5. Finishes and Walkthrough
Cabinetry, tile, flooring, fixtures, paint, lighting, and appliances bring the unit together. A final review gives the owner and builder a chance to identify details needing attention before completion.
How Homeowners Can Prepare
- Clarify the ADU’s current and future uses.
- Set priorities before finalizing the layout.
- Choose finishes on the agreed schedule.
- Keep access to the work area clear.
- Ask how decisions and updates will be communicated.
Frequently Asked Questions
How long does an ADU build take?
The schedule depends on design, permitting, site conditions, materials, and inspections. Ask for a project-specific timeline after the property and scope are reviewed.
Who handles ADU permits?
Five Star Design Build says its team coordinates permitting, giving the homeowner one point of contact.